激情视频在线观看,一级a毛片免费观看,91corn在线高清国产,aV小四郎在线最新地址,台湾佬中文娱乐网22,偷拍国产精品熟妇牲交,老司机在线视av,欧美色福利导航一区

Wafangdian Guangyang Bearing Group Co., Ltd.

Home >> Industry News

Contact Us

Tel:400-0058-999
Add:No. 2200, Section 3, South Street,Wafangdian City, Liaoning Province, China
Tel:0411-85647733
Fax:0411-85647666
Website:www.andrea-r.com

Industry News

Schaeffler Expands Charging Infrastructure Worldwide

Release Time:22 Aug,2024

<p style="text-align: center;"><img src="/ueditor/php/upload/image/20240822/1724340632599045.png" title="1724340632599045.png" alt="1.png"/></p><p style="text-align: justify;"><span style="font-family: arial, helvetica, sans-serif; font-size: 12px;">The Motion Technology Company Schaeffler continues to drive forward the expansion of the charging infrastructure at its locations. More than 5,000 additional charging points for electric vehicles are to be constructed worldwide by 2030. These include 3,000 charging points at European locations alone. This measure is part of Schaeffler’s sustainability program. The locations Herzogenaurach and Schweinfurt are acting as pilot projects for the technology and the operator model. Following the successful completion of the test phase, the project will be gradually rolled out in all other regions of the Schaeffler Group.</span></p><p style="text-align: justify;"><span style="font-family: arial, helvetica, sans-serif; font-size: 12px;">“Schaeffler stands for sustainability and is committed to e-mobility”, says Andreas Schick, chief operating officer of Schaeffler AG. “We are pursuing the higher-level objective of reducing our CO2 emissions on a continuous basis. This includes the carbon footprint for individual mobility. Through this project, we will increase Schaeffler’s attractiveness as a sustainable employer and further motivate our workforce to act in an environmentally conscious manner.”</span></p><p style="text-align: justify;"><span style="font-family: arial, helvetica, sans-serif; font-size: 12px;">Pilot projects in Herzogenaurach and Schweinfurt</span></p><p style="text-align: justify;"><span style="font-family: arial, helvetica, sans-serif; font-size: 12px;">As part of the redevelopment of a parking lot in Herzogenaurach, 40 charging points have been installed, which are initially available for employees without charge. These charging stations are the standard model used at all Schaeffler locations. They provide up to 22 kilowatts of charging capacity per station and are to be operated and maintained by an external partner in the future. The expansion plan for the Herzogenaurach location allows for the construction of a further 245 charging points for employees, company cars, and visitors in 2025. In Schweinfurt, the electrical infrastructure will first be expanded to allow the construction of a further 122 charging points. Initial operation is planned for 2025.</span></p><p><br/></p>
|
Quick links
Follow Us

Mobile Website

Wechat Platform

GroupMore

Wafangdian Guangyang
Bearing Group Co., Ltd.

Equipment & Capability

Copyright@2017Wafangdian Guangyang Bearing Group Co., Ltd.